-
Plastic Injection Molding Parts
-
Structural Foam Injection Moulding
-
Gas Assisted Injection Moulding
-
Plastic Injection Overmolding
-
Toolmaking Services
-
Rapid Prototype Tooling
-
3D Printing Rapid Prototyping Services
-
Vacuum Casting Prototype
-
CNC Machining Parts
-
Sheet Metal Rapid Prototyping
-
Surface Finishing Services
-
Pressure Die Casting Parts
-
Nate G.I really appreciated your working with us on the change and all throughout the process. If there's a possibility to give positive feedback, I'd love to do so. It's been great working with Haoshun so far!
-
Kevin W.We received your package of the molded parts. They look and function GREAT, so thank you very much. We are very impressed with your quality!
-
Mr. G. TaylorWe greatly appreciate your team's support and the quality of the work. I'm super happy by your service and quality, thank you very much!
Wholesales Travel Package Monthly Changed Contact Lens Case
Place of Origin | Guangdong, China |
---|---|
Brand Name | HMT |
Certification | ISO9001 |
Model Number | Custom |
Minimum Order Quantity | No MOQ Requirement |
Price | Negotiable |
Packaging Details | Wooden Crate, As per the mold size and customer requirement |
Delivery Time | 15-25 Days |
Payment Terms | T/T, L/C, D/A, D/P, Western Union, MoneyGram |
Supply Ability | 50 sets/month |
Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xDrawing | Customer Offer | Surface Finishing | Sandblasted |
---|---|---|---|
Part Material | ABS,etc. | Part Color | ColorfuL, ETC |
Application | Medical Parts | Tap Thread Hole | No Problem |
Packaging Details | Carton/ Wooden Case | Mould Life | 300K |
Wholesales Travel Package Monthly Changed Contact Lens Case
Our Services:
After model and prototype are confirmed, it will be mold design and manufacturing, product injection and production assembly. We have strict production management and an excellent manufacturing team. Our experienced engineers and business development specialist will ensure that your industrial engineering, tooling engineering, project management by experienced engineers and efficient engineering discussion is available at anytime. We have excellent mold making lead time, some molds 40 days, some molds even 14 days, up to your parts design.
C) Can you build our brand on your products?
Welcome to Get a Quote